Phase III – compressors on TCP2
The pressure in the Frigg reservoir declined as the gas was produced. Since the British Gas Corporation required deliveries at a constant pressure, equipment had to be installed on Frigg to achieve this in the pipeline.
That represented phase III in the field’s development. Three compressors – one for each process train – as well as power generators and process control modules were installed on treatment compression platform 2 (TCP2). Intended to serve both treatment platforms (TP1 and TCP2), the compressors were installed between the separators and dewatering units on TCP2.
The compressor and process control modules were fabricated in Orkanger, utilities at Nymo in Grimstad and the modules for two turbine-driven generators in Kristiansand. During installation work, TCP2 was shut down for a long period. The first compressor became operational on 24 September 1981 and the third on 20 November 1981.
Installastion of North-East FriggElf opens Harstad officeMore about history
close
Close

Hey guys, been using Fachai Casino Login lately and it’s pretty sweet. Easy to get in and the games are fun. Check it out: fachai casino login
Been diving into ‘cá rồng bạch kim’ with Lonuoirongbachkim, and seriously, my understanding of the game has improved so much. Highly recommend cá rồng bạch kim.
Thinking of trying PHL63 tonight. Heard good things from my friends. Time to see what all the hype is about! Go claim your bonus at phl63