Modules were installed on TCP2 during 1983 to permit the reception and treatment of gas from the Odin and North-East Frigg fields.
For Odin gas to be piped to land, capacity in the Frigg transport system had to be increased. This was achieved by installing extra compression equipment on the manifold compression platform (MCP-01), which operated until 1987.
Elf becomes Tromsø Patch operatorFemale OIMMore about history