TCP2 extension project
Modules were installed on TCP2 during 1983 to permit the reception and treatment of gas from the Odin and North-East Frigg fields.
For Odin gas to be piped to land, capacity in the Frigg transport system had to be increased. This was achieved by installing extra compression equipment on the manifold compression platform (MCP-01), which operated until 1987.
Elf becomes Tromsø Patch operatorFemale OIMMore about history
close
Close

Hey guys, been using Fachai Casino Login lately and it’s pretty sweet. Easy to get in and the games are fun. Check it out: fachai casino login
Been diving into ‘cá rồng bạch kim’ with Lonuoirongbachkim, and seriously, my understanding of the game has improved so much. Highly recommend cá rồng bạch kim.
Thinking of trying PHL63 tonight. Heard good things from my friends. Time to see what all the hype is about! Go claim your bonus at phl63